How Scaffolding Saved This Project: Interior Atrium Renovation

How Scaffolding Saved This Project: Interior Atrium Renovation

Case Study Series: Real Projects, Real Results

When a major tech company leased a multi-story office building in Dallas, they wanted to make a statement,starting with a complete renovation of the building’s five-story glass atrium. The challenge? Everything was indoors and nothing could touch the walls or the glass ceiling.

The Problem: Height, Interior Restrictions, and Fragile Finishes

Crews needed to reach over 50 feet high to install new light fixtures, HVAC ducts, and acoustic panels,without damaging the interior finishes or blocking the rest of the renovation work. Boom lifts and scissor lifts were ruled out due to weight restrictions on the floor and lack of maneuvering space.

The Solution: Free-Standing Scaffold Tower System

The project team deployed a free-standing aluminum scaffold tower system with a cantilevered working deck to reach over atrium obstacles. Key features included:

  • Lightweight but sturdy towers with wide base frames

  • Cantilevered decks to access awkward ceiling angles

  • Adjustable leveling for the sloped atrium floor

  • Safety rails, toe boards, and integrated ladders for OSHA compliance

The Results

Thanks to the scaffold solution:

  • All ceiling installations were completed without a single delay or damage report

  • The team worked simultaneously on lower floors while scaffolding stayed confined to a limited footprint

  • Over $15,000 in downtime was avoided by eliminating the need to move equipment between shifts

  • The job was done 10 days ahead of schedule, allowing early handoff to the tenant

Bonus Win: Quiet Setup, No Disruption

Because the scaffold system was modular and easy to install without heavy machinery, crews were able to work after hours without disturbing other ongoing work,or the neighboring tenants.